Visual LOTO Placards · Photos Stay On Your Computer
Free LOTO Procedure Viewer and 1910.147 Field Check
The LotoCard Free Viewer opens saved .lotocard.json procedure files directly on your computer with zero login and 0 bytes uploaded. Safety leads and maintenance supervisors can review every tagged shutoff point, check all 8 required 29 CFR 1910.147(c)(4)(ii) fields, and prep for annual periodic inspections in under 10 seconds.
CNC-VMC-04 — Haas VF-4 Vertical Machining Center
Plant 1 — Precision Machining · Bay B / CNC Cell 2 · Rev 2.1 · Effective 2026-11-01
| Pin | Magnitude | Isolation Device |
|---|---|---|
| E-1 | 480V AC 3-Phase / 70A | Main rotary disconnect handle on rear-left control cabinet |
| P-1 | 90 PSI Compressed Air | Lockable 3-way dump ball valve at rear air-prep manifold |
| G-1 | 420 lb Z-Axis Spindle Head | Z-axis hardwood/steel support block on table before servo brake service |
Field-Presence Completeness
100% (8/8)- PRESENT — Specific Equipment ID & Machine Name (1910.147(c)(4)(ii)(A)): CNC-VMC-04 — Haas VF-4 Vertical Machining Center
- PRESENT — Facility & Department Location (1910.147(c)(4)(ii)(A)): Plant 1 — Precision Machining / Bay B / CNC Cell 2
- PRESENT — Energy Source Pins & Magnitudes (1910.147(c)(4)(ii)(B)): 3 energy isolation point(s) documented with magnitudes.
- PRESENT — Shutoff & Energy-Isolating Devices (1910.147(c)(4)(ii)(B)): All pins specify exact physical shutoff/isolation device locations.
- PRESENT — Placement & Lock/Tag Hardware Method (1910.147(c)(4)(ii)(C)): All pins specify lockout hardware and personal lock/tag placement.
- PRESENT — Orderly Machine Shutdown Steps (1910.147(c)(4)(ii)(B)): 3 shutdown step(s) listed.
- PRESENT — Zero-Energy & Stored-Energy Verification (1910.147(c)(4)(ii)(D)): Per-pin and overall zero-energy verification steps populated.
- PRESENT — Lock Removal & Service Restoration Sequence (1910.147(c)(4)(ii)(C)): 3 restoration step(s) listed.
1910.147(c)(4)(ii) Field-Presence Completeness Check only — NOT an OSHA compliance certification or legal review. Final procedure accuracy, zero-energy verification, and regulatory compliance remain the sole responsibility of the employer and authorized personnel.
Technical Specifications & Comparison Matrices
| Tag | Energy Source | Typical Rating | Shutoff & Lockout Hardware |
|---|---|---|---|
| E-1 | Electrical | 240V–480V AC 3-Phase | Rotary disconnect + personal padlock + 6-hole hasp |
| S-1 | Stored / Auxiliary | 80–125 PSI Air / Gravity | Lockable dump or bleed valve, or rated safety block |
| V-1 | Verification | 0V AC/DC & 0 PSI | 8-point field-presence check + hands-on Live-Dead-Live test |
| Detail | 8.5x11 Letter Sheet | 11x17 Tabloid Sheet | Shop-Floor Standard |
|---|---|---|---|
| Finished Size | 11 x 8.5 in landscape | 17 x 11 in landscape | Fits 5-mil or 10-mil lamination |
| PDF Export Speed | Under 15 ms on your PC | Under 20 ms on your PC | 0 bytes of photos uploaded |
| Pin Table Capacity | Up to 6 energy tags | Up to 9 energy tags | Photo tags match table 1:1 |
| Saved Backup File | .lotocard.json (up to 12 MB) | .lotocard.json (up to 12 MB) | Re-open anytime offline |
| Option | Price (USD) | What You Get | Cost Per Machine |
|---|---|---|---|
| LotoCard Free Preview | $0 | Watermarked PDFs + local backups | $0.00 (no account) |
| LotoCard 20-Machine Pack | $29 one-time | 20 clean PDFs, unlimited sites | $1.45 per machine |
| LotoCard 80-Machine Pack | $79 one-time | 80 clean PDFs, unlimited sites | $0.99 per machine |
| Annual Desktop LOTO Seat | $1,219+ / yr | Recurring annual license | $24.38+ per machine (50x) |
Step-by-Step Execution Summary
- Click Load Local .lotocard.json File or pick one of the 16 built-in industrial presets.
- Check the energy tag table for voltage, pressure ratings, and exact shutoff locations.
- Review the 8-point 1910.147(c)(4)(ii) Field-Presence Check for any missing details.
- Jump back to the Placard Builder whenever you need to update a revision and print a new sheet.
Frequently Asked Questions
Do my saved procedure machine photos get uploaded to a cloud server?
No. Your photos stay right on your computer. Pinning, QR code creation, and PDF export all run inside your browser with 0 bytes of photo data sent to any server.
Does LotoCard certify OSHA 29 CFR 1910.147 compliance?
No. LotoCard runs an 8-point 1910.147(c)(4)(ii) Field-Presence Completeness Check to flag blank fields before you print. Final accuracy, zero-energy testing, and OSHA compliance stay with the employer and authorized personnel.
What paper sizes can I print and laminate?
You can export landscape 8.5x11 inch Letter or 11x17 inch Tabloid PDFs built to slip straight into 5-mil or 10-mil lamination pouches.
How does the 30-day refund work if my team changes its mind?
Unused credit packs get an instant full refund within 30 days right from your receipt page. Partially used packs get a pro-rated refund for the unused cards left in your pack.