Visual LOTO Placards · Photos Stay On Your Computer
29 CFR 1910.147(c)(4)(ii) LOTO Procedure Field Checklist
Under 29 CFR 1910.147(c)(4)(ii), every machine-specific written LOTO procedure must spell out four parts across 8 shop-floor fields: (A) exact equipment ID and scope, (B) orderly shutdown and energy shutoff locations with ratings, (C) lock/tag placement and service restoration steps, and (D) concrete zero-energy verification tests.
Technical Specifications & Comparison Matrices
| Tag | Energy Source | Typical Rating | Shutoff & Lockout Hardware |
|---|---|---|---|
| E-1 | Electrical | Clause (A)-(B): Scope & Shutoffs | Rotary disconnect + personal padlock + 6-hole hasp |
| S-1 | Stored / Auxiliary | Clause (C)-(D): Locks & Verification | Lockable dump or bleed valve, or rated safety block |
| V-1 | Verification | 0V AC/DC & 0 PSI | 8/8 required fields filled + annual periodic inspection (c)(6) |
| Detail | 8.5x11 Letter Sheet | 11x17 Tabloid Sheet | Shop-Floor Standard |
|---|---|---|---|
| Finished Size | 11 x 8.5 in landscape | 17 x 11 in landscape | Fits 5-mil or 10-mil lamination |
| PDF Export Speed | Under 15 ms on your PC | Under 20 ms on your PC | 0 bytes of photos uploaded |
| Pin Table Capacity | Up to 6 energy tags | Up to 9 energy tags | Photo tags match table 1:1 |
| Saved Backup File | .lotocard.json (up to 12 MB) | .lotocard.json (up to 12 MB) | Re-open anytime offline |
| Option | Price (USD) | What You Get | Cost Per Machine |
|---|---|---|---|
| LotoCard Free Preview | $0 | Watermarked PDFs + local backups | $0.00 (no account) |
| LotoCard 20-Machine Pack | $29 one-time | 20 clean PDFs, unlimited sites | $1.45 per machine |
| LotoCard 80-Machine Pack | $79 one-time | 80 clean PDFs, unlimited sites | $0.99 per machine |
| Annual Desktop LOTO Seat | $1,219+ / yr | Recurring annual license | $24.38+ per machine (50x) |
Step-by-Step Execution Summary
- Record the exact Equipment ID, machine name, plant, and bay location (1910.147(c)(4)(ii)(A)).
- List every energy rating (V, PSI, deg F, lb) and physical shutoff point ((c)(4)(ii)(B)).
- Write down the lock/tag hardware needed and the exact restart sequence ((c)(4)(ii)(C)).
- Spell out the Live-Dead-Live meter test, gauge-zero check, and try-start step ((c)(4)(ii)(D)).
Frequently Asked Questions
Do my 1910.147 checklist machine photos get uploaded to a cloud server?
No. Your photos stay right on your computer. Pinning, QR code creation, and PDF export all run inside your browser with 0 bytes of photo data sent to any server.
Does LotoCard certify OSHA 29 CFR 1910.147 compliance?
No. LotoCard runs an 8-point 1910.147(c)(4)(ii) Field-Presence Completeness Check to flag blank fields before you print. Final accuracy, zero-energy testing, and OSHA compliance stay with the employer and authorized personnel.
What paper sizes can I print and laminate?
You can export landscape 8.5x11 inch Letter or 11x17 inch Tabloid PDFs built to slip straight into 5-mil or 10-mil lamination pouches.
How does the 30-day refund work if my team changes its mind?
Unused credit packs get an instant full refund within 30 days right from your receipt page. Partially used packs get a pro-rated refund for the unused cards left in your pack.