LotoCard

Visual LOTO Placards · Photos Stay On Your Computer

Rotary Screw Air Compressor Lockout/Tagout Guide

Servicing a 50 HP rotary screw air compressor safely takes three steps: lock out the 480V 80A breaker disconnect (E-1) and let the VFD bleed down, close and lock the 125 PSI plant header valve (P-1) to stop backfeed while venting the sump to 0 PSI, and wait 30 minutes for 190 deg F oil (T-1) to cool.

Air compressors tied into a shared 110 to 125 PSI plant header catch experienced mechanics off guard because of header backfeed. Locking out the 480V 3-phase motor breaker stops the screw element, yet downstream receiver tanks and parallel compressors keep pushing 125 PSI right back into the discharge manifold until you close and lock the dedicated header ball valve with a clamshell lockout and vent the separator sump tank to 0 PSI. Two other hazards sit inside the cabinet: variable-frequency drives (VFDs) hold dangerous DC bus voltage for 5 to 10 minutes after power-off, and hot synthetic compressor oil runs between 180 deg F and 205 deg F, causing severe burns if an oil filter or separator lid opens early. LotoCard's rotary screw compressor preset comes pre-loaded with E-1, P-1, and T-1 callouts so your facilities team can photograph the utility room locally and print a laminated placard in 5 minutes.

Interactive Preset Workbench (100% Browser-Local)

DANGER: LOTO
CMP-ROT-02 — 50 HP Rotary Screw Air Compressor
Plant 1 — Utilities · Compressor Room East · Rev 1.2
LETTER 8.5×11
50 HP Rotary Screw Air Compressor energy isolation photograph
ENERGY ISOLATION POINTS3 TAGS
1910.147(c)(4)(ii) Field-Presence Completeness Check only — NOT an OSHA compliance certification or legal review. Final procedure accuracy, zero-energy verification, and regulatory compliance remain the sole responsibility of the employer and authorized personnel.LOTOCARDS.COM

Technical Specifications & Comparison Matrices

50 HP Rotary Screw Air Compressor Energy Isolation Quick Reference
TagEnergy SourceTypical RatingShutoff & Lockout Hardware
E-1Electrical480V AC 3-Phase / 80A VFDRotary disconnect + personal padlock + 6-hole hasp
S-1Stored / Auxiliary125 PSI Header + 190 deg F Oil SumpLockable dump or bleed valve, or rated safety block
V-1Verification0V AC/DC & 0 PSIConfirm 0 PSI sump gauge, 0V after VFD bleed, and oil < 110 deg F
Print & Shop-Floor Sheet Specifications
Detail8.5x11 Letter Sheet11x17 Tabloid SheetShop-Floor Standard
Finished Size11 x 8.5 in landscape17 x 11 in landscapeFits 5-mil or 10-mil lamination
PDF Export SpeedUnder 15 ms on your PCUnder 20 ms on your PC0 bytes of photos uploaded
Pin Table CapacityUp to 6 energy tagsUp to 9 energy tagsPhoto tags match table 1:1
Saved Backup File.lotocard.json (up to 12 MB).lotocard.json (up to 12 MB)Re-open anytime offline
LotoCard One-Off Packs vs Annual Desktop LOTO Software
OptionPrice (USD)What You GetCost Per Machine
LotoCard Free Preview$0Watermarked PDFs + local backups$0.00 (no account)
LotoCard 20-Machine Pack$29 one-time20 clean PDFs, unlimited sites$1.45 per machine
LotoCard 80-Machine Pack$79 one-time80 clean PDFs, unlimited sites$0.99 per machine
Annual Desktop LOTO Seat$1,219+ / yrRecurring annual license$24.38+ per machine (50x)

Step-by-Step Execution Summary

  1. Press Stop on the compressor controller and let the unit coast down unloaded.
  2. Open and lock E-1 (480V 80A breaker disconnect on the utility wall).
  3. Close and lock P-1 discharge header ball valve to block backfeed, then bleed the sump tank to 0 PSI.
  4. Confirm 0V after VFD capacitor bleed and check oil temperature is below 110 deg F before opening lines.

Frequently Asked Questions

Do my air compressor machine photos get uploaded to a cloud server?

No. Your photos stay right on your computer. Pinning, QR code creation, and PDF export all run inside your browser with 0 bytes of photo data sent to any server.

Does LotoCard certify OSHA 29 CFR 1910.147 compliance?

No. LotoCard runs an 8-point 1910.147(c)(4)(ii) Field-Presence Completeness Check to flag blank fields before you print. Final accuracy, zero-energy testing, and OSHA compliance stay with the employer and authorized personnel.

What paper sizes can I print and laminate?

You can export landscape 8.5x11 inch Letter or 11x17 inch Tabloid PDFs built to slip straight into 5-mil or 10-mil lamination pouches.

How does the 30-day refund work if my team changes its mind?

Unused credit packs get an instant full refund within 30 days right from your receipt page. Partially used packs get a pro-rated refund for the unused cards left in your pack.